
Asean power grid needs at least US$100 billion to build transmission lines: ADB
A minimum of US$100 billion would be required to build transmission lines to integrate the power grids of Southeast Asian nations by 2045, according to the Asian Development Bank (ADB). “The amount stems from the need for interconnectors in domestic power …